The passage through the rampart of the Powder Bridge

The connection of the upper and lower parts of the Deer Moat in September 2002 was the culmination of almost six years of work on the part of the Foundation. The programme, which was realised together with the Prague Castle Authority and other bodies, under the leadership of the architect Jiří Pleskot, cost the Foundation over 24 million crowns. A signboard with the names of the people who contributed to this ambitious structure can be found at the entrance to the tunnel in the upper section of the Deer Moat.